REQUEST FOR PROPOSALS - Environmental Consulting Services: City of Greenfield Downtown Revitalization Project
Updated: 3 days ago
The City of Greenfield, Missouri requests proposals from qualified professional consulting firms to conduct an ASTM Phase 1 Environmental Site Assessment (ESA) in downtown Greenfield. The ESA is required as part of the City’s downtown revitalization project, which is partially financed with Community Development Block Grant (CDBG) funds. The remainder of the project is being financed by a 20% local cash match contribution toward the project.
Background and Purpose
The project consists of the revitalization of 14 dilapidated buildings in downtown Greenfield to make them suitable for utilization by local businesses and organizations. Improvements will be focused on the enhancement of the period aesthetics of these buildings to maintain Greenfield’s history and downtown appeal. The project will involve the repair and rehabilitation to these properties to address declared slum and blight conditions currently present in the area and to prevent further deterioration of the structures. General improvements include roof repair/replacement, gutter system repair/replacement, brick repair and repointing, exterior awning/façade removal and repair, electrical system and lighting repair/updates, plumbing repair/updates, HVAC system improvements/updates, window and door replacement/repair, sidewalk repair/replacement, insulation improvements, ceiling/wallboard repair, entry and doorway repair, exterior stair replacement, subfloor and flooring replacement, and exterior and interior painting. A full list of improvements per building and are available upon request by contacting Kelsi Walker at KelsiWalker@MissouriState.edu.
The project site was previously developed over 100 years ago, as the City of Greenfield comprises the County seat of Dade County, Missouri and the project area includes the Dade County Courthouse, around which downtown Greenfield developed. Please note, the courthouse is not part of this project but resides in the project boundary (see map). Properties included in the project have maintained commercial and residential utilization since their construction. 13 of the 14 properties are fully commercial buildings, with the remaining building having a small residential section occupied by the building owner. To request an on-site visit and/or inspection of the 14 buildings included in this request, please contact Missy Netzer for more information at (417) 988-3470 or misltoe37@gmail.com.
Environmental Compliance
A hazardous waste site is located in the project boundary and an underground storage tank undergoing correction action is located within 0.5 miles of the project area. These sites were identified via NEPAssist and are the primary reason a Phase 1 ESA is required.
Location Map

Required Information
Information provided to the City of Greenfield must include at a minimum:
1. The specialized experience and technical competence of the firm with respect to conducting environmental site assessments or related work.
2. The capacity and capability of the firm to perform the work in question, including specialized services. The city will give high preference to firms who can complete Phase 1 ESA within two months of firm selection.
3. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules.
4. The firm’s proximity to and familiarity with the area in which the project is located.
5. Cost proposal.
6. References from previous clients of related work with the firm within the past five years.
7. Documentation of compliance with E-Verify requirements.
Submissions
The firm will be selected based on the above qualifications, with items #1, 2, and 5 having the greatest weight. Firms will be evaluated on an individual basis and will be ranked using a weighted evaluation matrix.
The above information should be submitted no later than Wednesday, November 18, 2026 at 5:00 p.m. via email to mark.davis@greenfieldmo.org or by mail or parcel services to Greenfield City Hall, 105 S Grand St. Greenfield, MO 65661. The City will accept email and physical submissions. For more information, contact Greenfield City Clerk, Mark Davis at (417) 637-2532.
The City of Greenfield is an Equal Opportunity Employer and invites the submission of proposals from minority, women, and Section 3-owned firms.
Addendum #1
Distributed November 19, 2026
After the original Request For Proposals was released, it was determined several environmental consulting services are needed in addition to the Phase 1 ESA. As a result, the City of Greenfield is releasing this addendum to extend the original proposal due date as well as add in the additional services into the requested scope of work. We encourage firms to submit a proposal for one or more of the services. If your firm previously submitted a proposal, you are invited to submit an updated version based off of this addendum, or you may choose to keep your previous submission as-is.
New submissions are due by Monday, November 30th by 5:00 PM.
The new scope of work includes the following environmental services:
1) Phase 1 ESA (all 14 buildings)
2) Radon testing (all 14 buildings)
3) Asbestos inspections (all 14 buildings)
4) Lead-based paint testing (only required for Property Y, 316 College St.)
Firms can submit one proposal that includes one or more of the above services. Proposals must clearly separate the cost estimate for each service.
Information provided to the City of Greenfield must include at a minimum:
1. The specialized experience and technical competence of the firm with respect to conducting environmental site assessments, asbestos inspections, radon testing, lead-based paint testing, or related work.
2. The capacity and capability of the firm to perform the work in question, including specialized services. The city will give high preference to firms who can complete the selected service(s) within two months of firm selection.
3. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules.
4. The firm’s proximity to and familiarity with the area in which the project is located.
5. Cost proposal.
6. References from previous clients of related work with the firm within the past five years.
7. Documentation of compliance with E-Verify requirements.
Additionally, please see the questions received and our responses below:
1. What existing reports are available?
Architectural main design is nearly complete. All available documents will be shared with the highest ranking firm.
2. Do you want one report covering all sites, or separate reports by building/parcel?
We would like the most cost-effective option; either one report or multiple reports are acceptable.
3. The boundary shown in the RFP figure encompasses a total of 51 parcels, excluding the courthouse. Are you seeking Phase I ESAs for only 14 of those parcels?
Correct. Only the 14 building parcels shaded in blue will be included.
4. Second, are you expecting a proposal for a single Phase I ESA report covering all subject property parcels, or would you be open to separate reports for each contiguous group of parcels?
We would like the most cost-effective option; either one report or multiple reports are acceptable.
Comments